Single loads and distributed loads can be used alone or in combination to load the bridge structures and beams within the MEC Line series.
The SE 200.25 load can be used for various experiments in combination with other accessories and is one of the smart, communication-enabled components. The data transmission and power supply of the intelligent components is done directly and wirelessly via the experimental setup and the mounting frame.
The load is placed at one of the points in the snap-in system of the roadway and automatically detected. Distributed loads can be generated by combining several loads. The load can be used to create a moving load in conjunction with the GUNT software. Depending on the length of the roadway, different numbers of loads can be placed on it. The load is equipped with an electronic module. The exact position on the roadway is recorded by means of a binary code (Gray code).
In experiments, the position is displayed directly on the load. The load force is displayed in the GUNT software. The visualisation in the software always corresponds to the actual experiment setup. The measured values are analysed in real time. The load is clearly laid out and well protected in a storage system.
Representative image only